|
|
Advanixs provides comprehensive and streamlined project management, with short development cycles. We manage to enhance project output and quality from repeatable, predictable and controllable processes, regardless of size. |
|
|
|
|
Product Lifecycle Management (PLM) |
|
|
|
|
Advanixs manages schedule, resources and deliverables during product development process with a reliable and integrated Product Lifecycle Management (PLM) System. Closely controlling processes and strict management of authorization policies ensure design quality and confidentiality of each project. Project schedule can be smartly arranged to take the best advantage of relative resources in each project development stage. An integrated BOM system makes it easier to evaluate the total cost of each product.
|
|
|
|
|
|
|
Advanixs has established an NPI (New Product Introduction) product development process, defined in its ISO-9001 standards to turn a product from concept to delivery. Advanixs' NPI process follows five sequential stages to completion: Planning, Design & EVT (Engineering Validation Test), DVT (Design Validation Test), PVT (Production Validation Test) and MP (Mass Production), each of which requires specific steps and criteria be applied to research, design, development, quality assurance, manufacturing and support. The project manager can smoothly lead the OEM/ ODM projects through a well-established and itemized list of NPI requirements and processes. Customers benefit from proven quality, total resource saving and faster product and solution development.
|
|
|
|
|
|
|
|
1. Plan
- MRS (Market Requirement)
- Model No. Definition
- GP Request Form
- Potential Patent List
- Project Team
- Technical Feasibility Evaluation
- Time Schedule
- Validation Plan
- PLM NPI Template
2. EVT (Engineering Validation Test)
- Engineering Spec.
- Design Review for Everything
- PCBA/Box Build & DFM Report
- EVT Tests & Sample Delivery
- Gate Meeting
- PLM Maintenance
3. DVT (Design Validation Test)
- Design Change & Review
- Design Review
- BOM w/ 2nd Sources
- PCBA/Box Build & DFM Report
- DVT Full Validation
- Customer Sample Approval
- Gate Meeting
- PLM Maintenance
4. PVT (Production Validation Test)
- Design Change & Review if any
- Product Transfer
- PCBA/Box Build
- Production Ability Review
- MTBF Test Report
- EMC / Safety Certifications
- Customer Sample Approval
- Close Meeting
- PLM Maintenance
5. MP (Mass Production)
|
|
|
|
|
|